⚡SolarRedlineROI StudioFree Interactive Studio
⚔️ vs AuroraSolar

SolarRedlineROI Studio — Free Interactive In-Browser Studio

🛡️ 100% ON-DEVICE STUDIO · ZERO CLOUD UPLOAD

Interactive Local Processing Studio

Instant 50ms preview directly in your browser. Zero server queues, zero data leaks.

Quick Scenarios (Click to Switch Mode):
📥
Step 1 · ImportUp to 50MB Local

Drop Local File Here or Click to Browse

Supports CSV, JSON, TXT, XML & Log Streams

🎛️ Step 2 · Tune Parameters50ms Live Sync
70%
Live Visual Inspection Stage
70% Free / 30% Pro

📊 Step 4 · Processed Output

✓
FREE CLEAN
✓
FREE CLEAN
🔒[PROTECTED PRO ROW] Full_Export
🛡️ 100% Local Privacy

Zero Cloud Upload Guarantee

All files and records are processed strictly inside your browser memory. Nothing ever touches an external server.

⚡ Instant 70% Free Preview

Verify Results Before Paying

Test with built-in sample records or drop your own local file to inspect 70% of the processed output free of charge.

💎 Uncapped Commercial Pro

Unlock 100% Export & Offline App

Remove the 30% batch lock immediately with a €3.99 Single Pass or $19 Lifetime Buyout (includes standalone Offline PRO Workstation & Manual).

Quick Reference & Frequently Asked Questions

How do you properly calculate a solar loan amount with a lender Dealer Fee?

Never multiply the cash price by (1 + Dealer Fee %). Because the solar lender deducts their fee percentage from the total gross loan amount, you must divide: Financed Loan Amount = Net Cash Price ÷ (1 - Dealer Fee Decimal). For example, a $28,000 cash deal with a 30% dealer fee is $28,000 ÷ 0.70 = $40,000.

What is a solar EPC redline and how are rep commissions calculated?

The Redline is the baseline price per watt (e.g., $2.15/W) that the EPC installer charges the sales organization to cover panels, inverters, racking, permits, and installation labor. Total commission equals (Net Sold Cash Price - (System Watts × Redline) - Project Adders).

What are the most common solar project adders that eat into rep commissions?

The five most expensive post-survey adders are 200A Main Panel Upgrades (MPU: $2,400–$3,200), Spanish/concrete tile roof mounts ($0.15–$0.25/W), steep-pitch/multi-array charges ($0.10–$0.20/W), structural rafter sistering ($1,200+), and ground-mount trenching ($25–$45/linear foot).

How are solar commissions typically split between a Setter and a Closer?

On self-gen deals, the closer keeps 100% of the net redline spread. On appointment-setter (canvasser/D2D) leads, standard splits range from 30% Setter / 70% Closer up to 50% / 50% for experienced setters who collect the full utility bill and shading photos.