SolarRedlineROI Studio — Free Interactive In-Browser Studio
Interactive Local Processing Studio
Instant 50ms preview directly in your browser. Zero server queues, zero data leaks.
Drop Local File Here or Click to Browse
Supports CSV, JSON, TXT, XML & Log Streams
📊 Step 4 · Processed Output
Zero Cloud Upload Guarantee
All files and records are processed strictly inside your browser memory. Nothing ever touches an external server.
Verify Results Before Paying
Test with built-in sample records or drop your own local file to inspect 70% of the processed output free of charge.
Unlock 100% Export & Offline App
Remove the 30% batch lock immediately with a €3.99 Single Pass or $19 Lifetime Buyout (includes standalone Offline PRO Workstation & Manual).
Quick Reference & Frequently Asked Questions
How do you properly calculate a solar loan amount with a lender Dealer Fee?
Never multiply the cash price by (1 + Dealer Fee %). Because the solar lender deducts their fee percentage from the total gross loan amount, you must divide: Financed Loan Amount = Net Cash Price ÷ (1 - Dealer Fee Decimal). For example, a $28,000 cash deal with a 30% dealer fee is $28,000 ÷ 0.70 = $40,000.
What is a solar EPC redline and how are rep commissions calculated?
The Redline is the baseline price per watt (e.g., $2.15/W) that the EPC installer charges the sales organization to cover panels, inverters, racking, permits, and installation labor. Total commission equals (Net Sold Cash Price - (System Watts × Redline) - Project Adders).
What are the most common solar project adders that eat into rep commissions?
The five most expensive post-survey adders are 200A Main Panel Upgrades (MPU: $2,400–$3,200), Spanish/concrete tile roof mounts ($0.15–$0.25/W), steep-pitch/multi-array charges ($0.10–$0.20/W), structural rafter sistering ($1,200+), and ground-mount trenching ($25–$45/linear foot).
How are solar commissions typically split between a Setter and a Closer?
On self-gen deals, the closer keeps 100% of the net redline spread. On appointment-setter (canvasser/D2D) leads, standard splits range from 30% Setter / 70% Closer up to 50% / 50% for experienced setters who collect the full utility bill and shading photos.