FlakeCoatROI Studio — Free Interactive In-Browser Studio
Interactive Local Processing Studio
Instant 50ms preview directly in your browser. Zero server queues, zero data leaks.
Drop Local File Here or Click to Browse
Supports CSV, JSON, TXT, XML & Log Streams
📊 Step 4 · Processed Output
Zero Cloud Upload Guarantee
All files and records are processed strictly inside your browser memory. Nothing ever touches an external server.
Verify Results Before Paying
Test with built-in sample records or drop your own local file to inspect 70% of the processed output free of charge.
Unlock 100% Export & Offline App
Remove the 30% batch lock immediately with a €3.99 Single Pass or $19 Lifetime Buyout (includes standalone Offline PRO Workstation & Manual).
Quick Reference & Frequently Asked Questions
How do you calculate exact epoxy and polyaspartic gallons using the 1,604 mil-spread formula?
One US gallon (231 cubic inches) of 100% solids coating covers 1,604 square feet at 1 mil (0.001 inch) wet-film thickness. Divide 1,604 by your target mil thickness: a 10-mil basecoat covers ~160 sq.ft./gal, and a 14-mil polyaspartic topcoat over scraped full-broadcast flake covers ~110–115 sq.ft./gal.
How many pounds of vinyl flake are needed for a full-broadcast rejection floor?
A true full-broadcast ('broadcast to rejection') 1/4-inch vinyl flake system consumes 0.13 to 0.16 lbs per square foot after scraping and vacuuming—meaning a 500 sq.ft. 2-car garage requires roughly two 40-lb boxes (75–80 lbs) of flake.
When must a concrete coating bid include a Moisture Vapor Barrier (MVB) primer?
Whenever calcium-chloride moisture testing exceeds 3 lbs/1,000 sq.ft./24 hrs (or relative humidity exceeds 75%–80%), standard basecoats can delaminate from hydrostatic pressure. An MVB epoxy primer requires an extra 8–10 mils (160–200 sq.ft./gal) and must be billed as a $0.75–$1.10/sq.ft. adder.
Why does a 1-day polyurea/polyaspartic system often yield higher net profit than 2-day epoxy?
Although polyurea/polyaspartic resin costs $20–$35 more per gallon than standard epoxy, a two-man crew completes grinding, basecoat, flake broadcast, scrape, and topcoat in a single 7-hour day—doubling weekly trailer output from 2.5 floors/week to 5 floors/week.