⚡FencePostROI StudioFree Interactive Studio
⚔️ vs mySalesman

FencePostROI Studio — Free Interactive In-Browser Studio

🛡️ 100% ON-DEVICE STUDIO · ZERO CLOUD UPLOAD

Interactive Local Processing Studio

Instant 50ms preview directly in your browser. Zero server queues, zero data leaks.

Quick Scenarios (Click to Switch Mode):
📥
Step 1 · ImportUp to 50MB Local

Drop Local File Here or Click to Browse

Supports CSV, JSON, TXT, XML & Log Streams

🎛️ Step 2 · Tune Parameters50ms Live Sync
70%
Live Visual Inspection Stage
70% Free / 30% Pro

📊 Step 4 · Processed Output

✓
FREE CLEAN
✓
FREE CLEAN
🔒[PROTECTED PRO ROW] Full_Export
🛡️ 100% Local Privacy

Zero Cloud Upload Guarantee

All files and records are processed strictly inside your browser memory. Nothing ever touches an external server.

⚡ Instant 70% Free Preview

Verify Results Before Paying

Test with built-in sample records or drop your own local file to inspect 70% of the processed output free of charge.

💎 Uncapped Commercial Pro

Unlock 100% Export & Offline App

Remove the 30% batch lock immediately with a €3.99 Single Pass or $19 Lifetime Buyout (includes standalone Offline PRO Workstation & Manual).

Quick Reference & Frequently Asked Questions

Why does dividing total fence footage by 8 always short your post and concrete order?

Every straight stretch between corners, ends, or gates requires (Length ÷ 8) + 1 posts, and any short panel cut under 8 feet still requires a full terminal post. A 180-foot yard split across 5 stretches with 2 gates takes 28–30 posts, not 23.

How many 80-lb bags of concrete are required per 4x4 or 5x5 fence post hole?

A standard 10-inch diameter auger hole dug 36 inches deep for a 5x5 vinyl or 4x4 wood post requires 2.0 to 2.4 bags of 80-lb concrete mix (or 3.2+ bags for a 12-inch x 42-inch heavy gate/corner post hole).

How should fence contractors price single walk gates and double-drive gates?

Never roll gates into your linear-foot price. Charge $375–$495 per 4-ft walk gate and $825–$1,150 per 8-ft to 10-ft double-drive gate to cover internal aluminum post stiffeners, welded gate frames, heavy-duty hinges, and extra leveling labor.

Is wet-setting or dry-setting/foam-setting fence posts more profitable for a 2-day crew?

For 6-ft privacy fences in high-wind zones, wet-mixed concrete on Day 1 (or driven steel PostMaster/I-posts that eliminate concrete cure wait times) allows a 3-man crew to complete 160–220 linear feet in 1.5 to 2 days at 35%+ net margin.